又浪又紧又丰满人妻

<menuitem id="rdzdf"></menuitem>

          <em id="rdzdf"></em>

          <video id="rdzdf"><nobr id="rdzdf"><big id="rdzdf"></big></nobr></video>
          
          

          <th id="rdzdf"></th>

          <p id="rdzdf"><sub id="rdzdf"><rp id="rdzdf"></rp></sub></p>

            <sub id="rdzdf"></sub>

            INDUSTRY News

            We deliver Hydraulic Cylinders to overseas countries

            On July 22, the national energy administration issued the of standard coal, coal gas industry scientific and orderly development of the notice, the energy conversion efficiency, strict entry requirements, such as water consumption and emissions industry.It is forbidden to build a coal-to-gas project with an annual capacity of 2 billion cubic meters or less, and a coal oil project with a production capacity of 1 million tons and below.To propose projects that are not included in the demonstration of the state and prohibit the construction of illegal construction of places without authorization.

            ?

            Under the influence of environmental pressure and energy structure adjustment, senior management has actively encouraged the development of coal-to-gas project in recent years.In September last year, the national energy administration held a symposium on the state-owned coal chemical industry and made clear that the industrial policy of developing new coal chemical industry would not change.According to the direction of China's energy policy, an orderly development of coal-to-gas and coal-to-liquid fuels and other projects.Top push reasons mainly include the coal gas project, from the Angle of environmental protection, high polluting coal is the main cause of haze weather, the coal gas as substitution of coal products, is a kind of clean and high quality fuel, pollution is relatively small, effectively alleviate the pressure of environmental protection, also can relieve the situation of excess production capacity of coal;From an economic point of view, as coal prices fall, the price difference between crude oil and coal is further expanded, and the economy of coal-to-gas projects gradually emerges.

            ?

            In addition to the implementation of project funds, the approval rate of coal-to-gas projects has also been accelerated in order to accelerate the acceleration of coal-to-gas projects.By the end of 2013, there were 61 projects that had been built, under construction and planned to build coal, with a total annual capacity of about 270 billion M3.This year, has obtained the flagging till now, more than 20 won the flagging coal gas project, coal gas investment scale in the next three years will exceed 240 billion yuan, the future of coal gas project construction is expected to accelerate.

            ?

            The high level of support for coal-to-gas projects has led to a flood of money, including small, low-value, coal-to-gas projects.Higher barriers to entry will protect the development of large-scale coal-based oil projects, and eliminate small, low-value coal oil and gas projects with low production value, low sustainable development and limited ability to control pollution.On the contrary, for some large coal oil and gas projects with scale advantages and capital operation specifications, the improvement of the threshold of entry will help to protect the market order and get the standard development.China chemical is a large domestic oil and gas contracting company.In July, a wholly owned subsidiary of China tianchen signed with yitai energy is about 4.7 billion yuan of total amount of 5.4 million tons/year coal-to-liquids project, along with the advancement of new found flagging coal chemical projects and orders in hand, step by step this year, the company is expected to step up in order to performance.

            ?

            The improvement of the entry threshold of the coal oil and gas projects also brings the opportunity for the development of large equipment manufacturers.Donghua technology is mainly engaged in the design consulting and engineering general contracting business of petrochemical industry. Currently, the company has strong technical reserves in the fields of coal-to-gas, coal-to-ethylene glycol, and coal-based olefins.Company orders are full, last year company orders nearly 8 billion yuan, the new signing in the first quarter of this year reached 4 billion yuan, the future can be included in the revenue of the mobile orders exceeding 15 billion yuan.Beijing, is engaged in the manufacture of refractory material and coal chemical industry belongs to the typical new energy efficient and environmentally friendly refractory refractory, the entire industry's growth - 25% from 15% a few years ago, quickly rose to more than 40%.Now it is the only listed company with a new type of coal - chemical refractory construction.

            Contact Us

            Address: Baoshi Road, Linjiang Industrial Park, Dawang Hi-tech Zone, Zhaoqing, Guangdong, China
            Tel:? +86-18126591998
            Fax: +86 758 3981814
            WeChat
            又浪又紧又丰满人妻